1. Site : Asan Factory 1 - 16,500㎡ / Asan Factory 2 - 4,300㎡
2. Measuring equipment : CMM, Micro-Hite, Thermal imaging camera, Surface resistance meter etc.
3. Staffing - equipment : 40 Personnel for Mechanical/Piping Assembly
- C-BOX : 10 In-house Assembly Personnel
4. Clean System : Clean Room 3,700㎡ (10,000Class), Constant temperature and humidity, DI-Water, Clean Air System
©O.N. ALL RIGHTS RESERVED.